Commercial Scale-Up & Pyrolysis Reactor Upgrade

Australia

The Problem

  • Existing R&D proof-of-concept reactors were unsuited for continuous commercial production.

  • Thermal performance suffered from inconsistent heating across operating units.

  • Non-standardized electrical systems and operational procedures created production risks.

  • Plant infrastructure was non-compliant with current Australian safety and hazardous-area standards

The Solution

  • Conducted a comprehensive technical review of all reactor units and operational processes.

  • Standardized thermal units by relocating reactor heating zones, heater bands, and thermocouples.

  • Completely redesigned electrical systems, operational procedures, and reactor physical layout.

  • Executed reactor descaling, installed new thermal insulation, and engineered upgraded hydraulic systems.

  • Performed a complete safety audit, adding compliant handrails, access platforms, and safety infrastructure.

The Outcome

  • Successfully transitioned a proof-of-concept R&D facility into a commercial-scale tyre pyrolysis plant.

  • Achieved consistent thermal distribution and operational reliability across all reactor trains.

  • Delivered full plant compliance with current Australian safety and hazardous-area regulatory standards.